Concrete Solutions 

Protection and repair for all ages of concrete.

Even the strongest materials need help sometimes. Crafco concrete solutions protect your vital infrastructure from start to finish.

Key Benefits:

Concrete-Solutions-card

Trusted by DOTs and road authorities worldwide

Concrete is exceptionally strong and durable, but it is still vulnerable to chemical and physical degradation. Crafco offers solutions to give your concrete project a good start and quickly handle distresses as they arise.

Crafco Concrete Cures are available in a variety of formulations to match your specific needs, helping concrete reach its maximum strength by minimizing moisture loss and controlling heat during the curing period.

PoreShield is a revolutionary bio-based concrete protectant that blocks deterioration from inside the pore system for 10+ years. PoreShield is safe to spray over water and requires no PPE, special equipment or special training.

Seal sawcut concrete joints with Crafco Roadsaver Silicone to block moisture and incompressible debris without compromising the joint’s ability to move. Roadsaver Silicone is jet-fuel resistant and has a demonstrated service life of 20+ years.

When cracks appear in concrete pavement, Crafco Roadsaver Gray hot-applied sealant provides a durable seal without calling attention to itself.

TechCrete offers a fast, durable repair for a wide range of concrete pavement distresses. This hot-applied mastic material is load-bearing but remains flexible to absorb thermal movement of the surrounding pavement. Best of all, TechCrete is simple to install and ready for traffic as soon as it cools.

For extremely fast concrete repairs that last all season, choose HP Concrete Cold Patch. It stays pliable in storage, requires no mixing or heating, and can be installed even when the pavement is wet.

Step 1

Preparation

  • Concrete pavements:
    • Ensure concrete is prepared according to ASBA guidelines, including a vapor barrier below the slab.
    • Ensure new concrete pavement has cured at least 28 days and is uniformly textured for proper adhesion.
    • Etch new and old concrete with muriatic acid and flush with clean water.
    • Apply two-part acrylic epoxy primer to ensure proper bond.
  • Asphalt pavements:
    • Ensure asphalt pavement complies with ASBA asphalt guidelines, including mix design and compaction.
    • New asphalt pavement must be aged at least 14 days before application.
  • All pavements must be clean, dry and free of grease, oil or debris before application.

Resources

Canada-HP-Concrete-Cold-Patch

Canada HP Asphalt Cold Patch

Canada Geotac Paveprep

Canada Detack

Step 2

Installation

  • Action Pave is a multi-part system consisting of resurfacer, filler, cushion, color and finisher. Apply each layer in the following manner:
    • Pour a ribbon of material along one end of the area to be surfaced. Spread evenly with a squeegee by walking in one direction and then reversing direction.
    • Before applying the next coat of material, inspect coating and scrape off any ridges, lumps or other imperfections.
    • Apply the next coat 90 degrees to the previous coat.

Resources

Canada-HP-Concrete-Cold-Patch

Canada HP Asphalt Cold Patch

Canada Geotac Paveprep

Canada Detack

Case Studies

image description

Interstate 35 Rehabilitation

Texas DOT saved $3.2M by using Crafco solutions across 72 lane miles, extending pavement life by 7+ years.

Cost Savings — $3.2M
Lane Miles — 72
image description

Chicago Urban Streets

City of Chicago reduced complaint calls by 82% after implementing a targeted preventive maintenance program.

Complaints — -82%
ROI — 327%

Problems & Solutions

Resources

These complementary products work together for optimal concrete repair, preservation and protection.

HP ER Asphalt Cold Patch

Quick, durable pothole patching.

HP-ER-single-component

Mastic One

Versatile, durable pavement patches.

Mastic_One-Manhole

Ultraseal

Bridge deck protection that lasts.

Ultraseal Bridge Deck Installation

Frequently Asked Questions

How long before traffic can be restored after application?

Typically, our bridge deck membranes are ready for traffic within 24 hours of application, depending on temperature and humidity conditions. Please consult the product data sheet for specific cure times.

Typically, our bridge deck membranes are ready for traffic within 24 hours of application, depending on temperature and humidity conditions. Please consult the product data sheet for specific cure times.

Typically, our bridge deck membranes are ready for traffic within 24 hours of application, depending on temperature and humidity conditions. Please consult the product data sheet for specific cure times.

Contact us

This field is for validation purposes and should be left unchanged.
Name(Required)
Address(Required)