The City of Tempe combines crack sealing with pavement scanning technology to maximize thier road quality citywide.
Studies have shown that for every $1.00 spent on crack sealing, $4.00 or more is saved in rehabilitation cost.
Pavement cracks are inevitable, but if left untreated, they widen and become potholes. Crack sealing stops the infiltration of moisture and incompressible debris that lead to further deterioration.
On roads, cracks degrade ride quality and lead to potholes. In pedestrian areas, cracks can present a tripping hazard. And in high-performance environments like airport runways, deterioration can endanger lives. Crack sealing stops those problems before they start, preventing the need for more costly and time-consuming repairs.
Crafco’s Roadsaver Gray Crack Sealant offers the same outstanding performance as our conventional sealants, with an inconspicuous gray color that blends into concrete and oxidized asphalt.
The steps below are intended as an overview. Before installation, consult the product documentation for specific details
The City of Tempe combines crack sealing with pavement scanning technology to maximize thier road quality citywide.
Water that seeps into unsealed cracks can erode the subbase over time, leading to pavement failure. Crack sealing allows water to run off the road harmlessly as designed.
In winter, moisture in cracks can freeze and expand, widening cracks and causing potholes to develop rapidly. Crack sealing prevents ice from forming in cracks, stopping a root cause of potholes.
Cracks that contain incompressible debris can be further broken up as the pavement expands and contracts with the weather. Crack sealant blocks debris, stopping the deterioration.
Typically, our bridge deck membranes are ready for traffic within 24 hours of application, depending on temperature and humidity conditions. Please consult the product data sheet for specific cure times.
Typically, our bridge deck membranes are ready for traffic within 24 hours of application, depending on temperature and humidity conditions. Please consult the product data sheet for specific cure times.
Typically, our bridge deck membranes are ready for traffic within 24 hours of application, depending on temperature and humidity conditions. Please consult the product data sheet for specific cure times.